Practical estimating and scheduling ----- Critical Path /“Pert” Charts
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
A “Work Breakdown Structure” Work Breakdown Structure Every trackable non-free task Everything How many people, how much time
Background image of page 2
some tasks we forget meetings document preparation status and project management customer training
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
typical - done once Customer meetings System Spec Review SRS Review Top Level Design Test Plan Review Integration Documentation Customer Site Deployment
Background image of page 4
typical - done for each module Detailed Design Code Walk-thru / Review Unit Test
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
A Project Management Tool If you’re not doing Critical Paths, you’re not doing project management. Shows the time sequence of events, including parallel efforts. Determines length (calendar time) of a project.
Background image of page 6
Required Data List of Activities Activity Duration (best estimate) Sequential Activity Relationships what precedes a task what can be done at the same time what follows a task
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Output Information Activity and Project Completion Time Critical Path / Critical Activities / A delay here will delay the entire project Activity Slack – a single activity not in the critical path has extra time to complete
Background image of page 8
Pert Chart tasks a and b can start simultaneously task c can start after a is complete task d can start after b is complete c and d must complete before e can begin 0 A B C&D E a b c d e
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
How to… The Next Task Duration The Completion of the Task The Task
Background image of page 10
Draw a Pert Chart for this job: Task Title Duration Precedence a. start 0 - b. think 1 a c. plan 2 b d. procrastinate 5 a e. assign to someone else 1 c,d f. hide 3 e g. finish 1 e h. grab credit 1 f,g
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
A B C&D E F F&G D a b d c e f G g 0 1 2 5 1 3 1 Critical Path = A D E F H slack in B C, G H 1 C
Background image of page 12
A good first-phase estimate can be done in a day.
Background image of page 13

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 14
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}