Exercise 8 - 1 Process control parameters Select Display...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Exercise 8: Run Material Requirements Planning – Single Item, Single Level Navigation Menu Path Logistics Materials Management Materials Requirements Planning (MRP) MRP Planning Single-Item, Single-Level Trans Code MD03 Enter the following information: Enter material number: SPEN_ _ _ Enter plant: P999 MRP control parameters Processing key: NETCH Create pur. req.: 2 Deliv. schedule: 3 Create MRP list: 1 Planning mode: 1 Scheduling:
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 1 Process control parameters Select Display results before they are saved (Enter) A warning message appears - please check input parameters (Enter) again to confirm and check the warning message Review the MRP list Note: Your MRP list may appear different depending on dates and orders. (Save) (Exit) To return to SAP Easy Access Menu Record the system message: Message...
View Full Document

This document was uploaded on 11/03/2011 for the course CIS 3380 at Texas State.

Page1 / 2

Exercise 8 - 1 Process control parameters Select Display...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online