Portfolio Insurance (1)

Portfolio Insurance (1) - Portfolio Insurance Copyright...

Info iconThis preview shows pages 1–11. Sign up to view the full content.

View Full Document Right Arrow Icon
1 Portfolio Insurance Copyright © 1998-2006 Investment Analytics
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Copyright © 1998-2006 Investment Analytics Portfolio Insurance Slide: 2 Portfolio Insurance ± What is it? ± Why use it? ± How to apply in practice
Background image of page 2
Copyright © 1998-2006 Investment Analytics Portfolio Insurance Slide: 3 Portfolio Insurance: Rationale ± Portfolio ± 1000 shares stocks A, 1000 shares stock B ± Volatility of each stock 30% ± Current stocks price of A and B is $50 ± T-Bill rate is 8% ± Scenario: ± Expect FED to tighten in next three months ± Portfolio value must not fall below $90,000 ± Calculate all-in costs of protection: ± Use the option calculator ± Worksheet: Portfolio Insurance Intro
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Copyright © 1998-2006 Investment Analytics Portfolio Insurance Slide: 4 Cost of Protection ± Cost of 3m put option with $45 strike is $0.79 ± Need 2,000 options ± Hence all-in cost is $0.79 x 2000 = $1,586
Background image of page 4
Copyright © 1998-2006 Investment Analytics Portfolio Insurance Slide: 5 Hedging a Portfolio ± Next, assume A and B are uncorrelated: Corr(A,B) = 0 ± Compute the volatility of the portfolio ± Calculate the all-in cost of hedging the portfolio ± Reminder: σσ σ ρ p ww w w =+ + [] 1 2 1 2 2 2 2 2 12 2
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Copyright © 1998-2006 Investment Analytics Portfolio Insurance Slide: 6 Cost of Hedging Portfolio ± Hedging Cost: ± SD of Portfolio 21.21% ± Black Scholes option price $0.29 ± Hence cost of portfolio hedge: 2,000 x $0.29 = $579 ± Cost saving = $1,007 ± Finding: Cost of option on portfolio is less than cost of portfolio of options
Background image of page 6
Copyright © 1998-2006 Investment Analytics Portfolio Insurance Slide: 7 Evolution of Portfolio Insurance ± PROBLEM: option on portfolio doesn’t exist ± Hence create put option synthetically ± Replicate hedged portfolio ± Dynamic Hedging Strategy ± Leyland, O’Brien, Rubenstein (LOR)- 1980’s
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Copyright © 1998-2006 Investment Analytics Portfolio Insurance Slide: 8 Portfolio Insurance Illustrated Fund Value S&P500 Insured Portfolio Floor
Background image of page 8
Copyright © 1998-2006 Investment Analytics Portfolio Insurance Slide: 9 Portfolio Insurance Illustrated Fund Value S&P500 Insured Portfolio Cost Deductible Floor
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Copyright © 1998-2006 Investment Analytics Portfolio Insurance Slide: 10 Insurance S&P500 Insured Portfolio Cost Smaller Deductible = Higher Cost Deductible Fund Value
Background image of page 10
Image of page 11
This is the end of the preview. Sign up to access the rest of the document.

This document was uploaded on 11/04/2011 for the course ECON 421 at CUNY York.

Page1 / 31

Portfolio Insurance (1) - Portfolio Insurance Copyright...

This preview shows document pages 1 - 11. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online