10-02Pr_5e_s

Survey of Accounting (Available Titles Cengagenow)

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Name: Section: Score: 0% Answers are entered in the cells with gray backgrounds. Cells with non-gray backgrounds are protected and cannot be edited. A red asterisk (*) will appear in the row immediately to the right of an incorrect answer. 1. Schedule of manufacturing costs incurred during April: Direct Direct Factory Job Materials Labor Overhead Total No. 201 No. 202 No. 203 No. 204 No. 205 No. 206 Balance of Work in Process, April 30 2. Schedule of cost of jobs finished during April: Direct Direct Factory Job Materials Labor Overhead Total No. 201 No. 202 No. 203 No. 205 Balance of Work in Process, April 30 3. Schedule of cost of goods sold during April: Direct Direct Factory Job Materials Labor Overhead Total No. 201 No. 202 No. 203 Balance of Work in Process, April 30 4. Schedule of completed jobs on hand, April 30, 2010: Direct Direct Factory Job Materials Labor Overhead Total No. 205 5. Schedule of unfinished jobs: Direct Direct Factory Job Materials Labor Overhead Total
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/04/2011 for the course ACC 121 taught by Professor Thomas during the Winter '08 term at Baker MI.

Page1 / 2

10-02Pr_5e_s - Problem 10-2 Name: Section: Score: 0%...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online