10-03Pr_5e_s

Survey of Accounting (Available Titles Cengagenow)

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Name: Section: Score: 0% Answers are entered in the cells with gray backgrounds. Cells with non-gray backgrounds are protected and cannot be edited. A red asterisk (*) will appear in the row immediately to the right of an incorrect answer. a. JOB ORDER COST SHEET Customer Queen Mercury Date May 10, 2010 Address 10 Rhapsody Lane Date wanted June 12, 2010 Lake Forest Date completed June 8, 2010 Item Reupholster couch and chair Job. No. 10-206 ESTIMATE Direct Materials Direct Labor Summary Amount Amount Amount 40 meters at $12 24 hours at $15 Direct materials Direct labor Factory overhead Total Total ACTUAL Direct Materials Direct Labor Summary Description Amount Description Amount Item Amount 210 24 meters at $12 H25 18 hours at $14.50 Direct materials Direct labor 212 21 meters at $12 H34 9 hours at $14.50 Factory overhead Total Total Total Comments: Instructions Mat. Req. No. Time
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/04/2011 for the course ACC 121 taught by Professor Thomas during the Winter '08 term at Baker MI.

Page1 / 2

10-03Pr_5e_s - Problem 10-3 Name: Section: Score: 0%...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online