11-08Ex_5e_s

Survey of Accounting (Available Titles Cengagenow)

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Exercise 11-8 Name: Section: Score: 0% Answers are entered in the cells with gray backgrounds. Cells with non-gray backgrounds are protected and cannot be edited. A red asterisk (*) will appear in the row immediately to the right of an incorrect answer. = - = - = per mile. - - Total Fixed Costs = Instructions Variable Cost per Gross- Ton Mile
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Exercise 11-8 Name: SOLUTION Section: Score: See student sheet for student's score Scoring: ON Answers are entered in the cells with gray backgrounds.
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Cells with non-gray backgrounds are protected and cannot be edited. A red asterisk (*) will appear in the row immediately to the right of an incorrect answer. = Cost at high point-Cost at low point = $875,000 -$600,000 = $2.20 per mile. Gross-ton miles at high point-Gross-ton miles at low point 325,000 -200,000 Total Fixed Costs = $160,000 Instructions Variable Cost per Gross-Ton Mile...
View Full Document

This note was uploaded on 11/04/2011 for the course ACC 121 taught by Professor Thomas during the Winter '08 term at Baker MI.

Page1 / 2

11-08Ex_5e_s - Cells with non-gray backgrounds are...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online