13-05Pr_5e_s

Survey of Accounting (Available Titles Cengagenow)

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Problem 13-2 Name: Section: Score: 0% Answers are entered in the cells with gray backgrounds. Cells with non-gray backgrounds are protected and cannot be edited. A red asterisk (*) will appear in the row immediately beside or below an incorrect answer. 1. a. Direct Materials Cost Variance Price variance: Actual price Standard price Variance - Actual quantity x = Quantity variance: Actual quantity Standard quantity Variance - x Standard price = Total cost variance - 1. b. Direct Labor Cost Variance Rate variance: Actual rate Standard rate Variance - Actual time (hours) x = Time variance: Actual time (hours) Standard time (hours) Variance - Standard rate x = Total cost variance - 1. c. Factory Overhead Cost Variance Variable factory overhead controllable variance: Actual variable factory overhead cost incurred Budgeted variable factory overhead for 1,300 hrs. Variance - Fixed factory overhead volume variance: Normal capacity at 100% (hours) Standard for amount produced (hours) Productive capacity not used (hours)...
View Full Document

This note was uploaded on 11/04/2011 for the course ACC 121 taught by Professor Thomas during the Winter '08 term at Baker MI.

Page1 / 2

13-05Pr_5e_s - Problem 13-2 Name: Section: Score: 0%...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online