13-09Ex_5e_s

Survey of Accounting (Available Titles Cengagenow)

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Exercise 13-9 Name: Section: Score: 0% Answers are entered in the cells with gray backgrounds. Cells with non-gray backgrounds are protected and cannot be edited. A red asterisk (*) wil appear in the row immediately to the right of an incorrect answer. HAMMER RACKET COMPANY Direct Labor Cost Budget For the Month Ending October 31, 2010 Forming Assembly Department Department Hours required for production: Junior Pro Striker Total Hourly rate Total direct labor cost Instructions
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Exercise 13-9 Name: SOLUTION Section: Score: See student sheet for student's score Scoring:
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ON Answers are entered in the cells with gray backgrounds. Cells with non-gray backgrounds are protected and cannot be edited. A red asterisk (*) wil appear in the row immediately to the right of an incorrect answer. HAMMER RACKET COMPANY Direct Labor Cost Budget For the Month Ending October 31, 2010 Forming Assembly Department Department Hours required for production: Junior 1,900 3,040 Pro Striker 7,735 14,365 Total 9,635 17,405 Hourly rate $16.00 $12.00 Total direct labor cost $154,160 $208,860 Instructions...
View Full Document

Page1 / 2

13-09Ex_5e_s - ON Answers are entered in the cells with...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online