13-29Ex_5e_s

Survey of Accounting (Available Titles Cengagenow)

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Exercise 13-29 Name: Section: Score: 0% Answers are entered in the cells with gray backgrounds. Cells with non-gray backgrounds are protected and cannot be edited. A red asterisk (*) will appear in the row immediately beside or below an incorrect answer. Variable overhead controllable variance: Actual variable factory overhead cost incurred Budgeted variable factory overhead for 5,000 hrs. Variance - Fixed factory overhead volume variance: Productive capacity at 100% hrs. Standard for amount produced hrs. Productive capacity not used hrs. Standard fixed factory overhead rate x Variance - Total factory overhead cost variance Alternative Computation of Overhead Variances: Actual Costs Applied Costs Balance Budgeted Factory Actual Factory Overhead for Amount Applied Factory Overhead Produced Overhead Variable cost Fixed cost Total Controllable Volume Variance Variance Total factory overhead cost variance Instructions
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Exercise 13-29 Name: SOLUTION Section: Score: See student sheet for student's score
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

13-29Ex_5e_s - Exercise 13-29 Name: Section: Score: 0%...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online