ch04_solutions - 500 600 1000 600 Processing cost ($/gal)...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Western Swiss Machine Shop Influence Diagram Model Parameters Deluxe skis Regular skis Limits Profit (SFr/unit) 4 3 roughing time 40 20 1000 finishing time 20 26.6666666667 800 Apple Hill contract 0 1 18 Decision Variables Xd Xr 16 18 Model Output Values RHS Slack/Surplus Objective function 118 Roughing time maximum 1000 1000 0 Finishing time maximum 800 800 0 Apple Hill contract minimum 18 18 0 Western Swiss should make 16 pairs of deluxe skis and 18 pairs of regular skis each week Number of each type of ski to make maximize profits capacity contractual obligations roughing hours finishing hours
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Modeling Exercise 20 Influence Diagram Model parameters Process A Process B Process C Process D Limit Set-up cost ($)
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 500 600 1000 600 Processing cost ($/gal) 0.06 0.05 0.04 0.03 Capacity 20000 15000 40000 25000 Demand 35000 Decision Variables A B C D X 35000 D 1 Model Output Value RHS Slack/Surplus Objective function 2400 Minimum production 35000 35000 Process A capacity Process B capacity Process C capacity-5000 5000 Process D capacity We should produce all 35,000 gallons using process C Which processes to use (Di) How much paint to produce on each process (Xi) minimize costs fixed costs (setup) demand variable costs (processing) process capacities...
View Full Document

Page1 / 2

ch04_solutions - 500 600 1000 600 Processing cost ($/gal)...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online