scag5e_ppt_8_8 - work hours in the finishing department....

Info iconThis preview shows pages 1–10. Sign up to view the full content.

View Full Document Right Arrow Icon
Section 8.8 Linear Programming
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
OBJECTIVE 1
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
OBJECTIVE 2
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Consider the linear programming problem Maximize: 0.05 0.08 subject to the conditions that 0 0 30 20 5 I x y x y x y x y = + +
Background image of page 6
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 8
Minimize the expression 3 4 subject to the constraints 7 10 5 0 0 z x y y x x y x y = + +
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
A factory manufactures two kinds of ice skates: racing skates and figure skates. The racing skates require 8 work hours in the fabrication department, whereas the figure skates require 4 work hours there. The racing skates and the figures skates each require 2
Background image of page 10
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: work hours in the finishing department. The fabricating department has available at most 224 work hours per day, and the finishing department has no more than 72 work hours per day available. If the profit on each racing skate is $15 and the profit on each figure skate is $12, how many of each should be manufactured each day to maximize profit? (Assume that all skates made are sold.)...
View Full Document

Page1 / 10

scag5e_ppt_8_8 - work hours in the finishing department....

This preview shows document pages 1 - 10. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online