Total budgeted costs can also be shown graphically

Total budgeted costs can also be shown graphically - levels...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Total budgeted costs can also be shown graphically, as in Illustration  21-15 . In the graph, the  horizontal axis represents the activity index, and costs are indicated on the vertical axis. The graph  highlights two activity levels (10,000 and 12,000). As shown, total budgeted costs at these activity 
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: levels are $70,000 [$30,000 + ($4 10,000)] and $78,000 [$30,000 + ($4 12,000)], respectively. Graphic flexible budget data highlighting 10,000 and 12,000 activity levels...
View Full Document

This note was uploaded on 11/08/2011 for the course ACCOUNTING ac 202 taught by Professor - during the Fall '11 term at Montgomery.

Ask a homework question - tutors are online