16_mar_682_ocw

16_mar_682_ocw - 16.682 The Aerospace Industry March 16...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
16.682 The Aerospace Industry March 16 Class Special Guest: Prof. Wesley Harris
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Plan for the Class 3:05-3:10 Announcements and Introductions 3:10-3:55 LEV Ch 5 Discussion 3:55-4:05 Break 4:05-4:50 Av Week Article Discussion 4:50-4:55 Return Journal Assignments Muddy cards 4:55 Adjourn
Background image of page 2
Software Upgrades More Than Code: System ~ 16 months ~ 31 months ~ 26 months (Sensors, Trainers, Etc.) System Test ~34% System Design and Development ~ 11% Code Generation ~ 1/2 the Design and Development Cost ~ 6% of total Cost Field Testing System Design and Software Development Requirements Derivation Major Activities and Times Program Initiation Other ~ 50% Requirement Derivation ~ 5% End to End Software Development Cycle Time ~ 62 Months Estimated Total Cost Distribution Source: Ippolito and Murman, DASC 2001 Adapted from Murman et al., "Challenges in the better, faster, cheaper era of aeronautical design, engineering and manufactuing, The Aeronautical Journal, Oct. 2000.
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Points Captured from Class Discussion Islands of Success How do IOS get started and form?
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 9

16_mar_682_ocw - 16.682 The Aerospace Industry March 16...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online