costestim

costestim - Labor Rate Machine Use(operates at 1560 watts I...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
16.810 IAP 2005 Engineering Design and Rapid Prototyping Prof. O. de Weck s A . B e l l , C . G r a f f Massachusetts Institute of Technology January 3, 2005 Version 1.1 Cost Estimation Sheet To be submitted by each team by: January 25, 2005 Rate Qty Total Cost $75/hour $40/hour $50/sheet $125/sheet $5 per length $35/sheet $40/hour $70/KW-hour $55/hour $75/hour $35/hour $30/hour $55/hour $300/hour Hours Cost:
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Labor Rate Machine Use (operates at 1560 watts) I. Design and Engineering VI. Assembly and Testing Labor Rate Machine Use IV. Waterjet Manufacturing Other Miscellaneous Work Labor Rate Fiberglass Labor Rate V. Other Manufacturing Wright Brother's Wind Tunnel Operating Cost Assembly Work Labor Rate Please use this cost estimation sheet to compile the number of hours spent on the specific parts of the project. Also, please compile the total costs associated with the project at the specified labor rates. If there are any questions, please direct them to the TA’s....
View Full Document

This note was uploaded on 11/08/2011 for the course AERO 16.810 taught by Professor Olivierdeweck during the Winter '07 term at MIT.

Ask a homework question - tutors are online