sohl_mit_brief - .7 V1 0 F/A-18A/B/C/D Flight Control...

Info icon This preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
F/A-18A/B/C/D Flight Control Computer Software Upgrade Military Aircraft System Verification and Validation MIT 16.885J/ESD.35J Fall 200 4 CDR Paul Sohl Commanding Officer United States Naval Test Pilot School V10.7
Image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Briefing Summary • US Navy Acquisition Process Overview • F/A-18 Aircraft Overview • Flight Control Law Software Upgrade Program – Requirements – Results • Conclusions Constraints and Challenges
Image of page 2
Defense Acquisition Management Framework IOC B A Tech Development Operations & Support C Technology Opportunities & User Needs Concept Exploration Technology Development Demonstration LRIP Full-Rate Prod & Critical FRP FOC Capability Acquisition (Demonstration, Engineering IOC: Initial Operational Capability FOC: Full Operational Capability Validated & approved by Initial Capabilities Document (ICD) Capabilities Development Document (CDD) Capabilities Production Document (CPD) EEntrance criteria met before entering phases EEvolutionary Acquisition or Single Step to Full Concept & System Development & Demonstration Production & Deployment System Integration System Deployment Design Review Decision Review Sustainment Disposal PProcess entry at Milestones A, B, or C Sustainment Pre-Systems Systems Acquisition Development, LRIP & Production) operational validation authority Relationship to Requirements Process
Image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
System Development & Demonstration Phase B System Demonstration System Integration Critical Design Review System Integration System Demonstration Enter: PM has technical solution but Enter: Prototypes demonstrated in has not integrated subsystems into intended environment complete system z Activities: Complete z Activities: System Integration of development. DT/OT/LFT&E demonstrated subsystems and Exit : System demonstration in components. Reduction of integration intended environment using risk engineering development Exit: Demonstration of prototypes in models; meets validated relevant environment requirements
Image of page 4
System Development & Demonstration Phase Purpose: To develop a system Reduce program risk
Image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern