Project Management Tools and Methods

Project Management Tools and Methods -...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Project Management Tools and Methods  - 6 questions covering: Gantt charts Captures estimated time for each task, and show relationships between tasks Network Diagrams or PERT Chart Critical Path analysis is based on a  PERT Chart or Network Diagram PERT (Program Evaluation and Review Technique) Tool that facilitates decision making Valuable to manage where multiple tasks are going simultaneously to reduce the  redundancy Task/work breakdown Creating a project line Building a PERT chart Determining the critical path of the project Critical path Longest possible continuous pathway taken from the initial event to the terminal  event. It determines the total calendar time required for the project; and,  therefore, any time delays along the critical path will delay the reaching of the  terminal event by at least the same amount Project Resource Budgeting  - 6 Questions covering:
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/09/2011 for the course SPEA-V 369 taught by Professor T.c.bradely during the Spring '11 term at Indiana.

Page1 / 2

Project Management Tools and Methods -...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online