112 Chapter 10 Network Models 10.16 Longest Path: 1-2-3-5-6-7 = 87 10.17 Longest path: 1-3-5-7-11-12 = 83 16 18 12 20 13 26 11 9 22 17 14 1 0 0 0 2 18 18 0 3 30 30 0 5 56 56 0 4 45 43 2 6 73 73 0 7 87 87 0 5 15 6 13 4 16 11 24 12 16 22 18 12 10 8 17 6 18 16 11 1 0 0 0 2 9 5 4 4 27 19 8 3 15 15 0 5 21 21 0 7 43 43 0 6 42 31 11 8 71 54 17 11 67 67 0 9 59 48 11 10 65 54 11 12 83 83 0
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Solutions Manual and Workbook 113 SHORTEST PATH NETWORKS 10.18 Shortest Path = 52 10.19 Shortest Path = 45 10.20 Total = 29 10.21 Total = 27 10.22 Total = 37 0 16 18 12 26 13 20 9 11 22 17 14 16 18 29 40 38 52 5 15 13 4 6 16 18 12 10 8 17 16 11 24 12 16 18 11 6 22 0 5 15 13 29 17 23 40 33 31 45 53
Background image of page 2
114 Chapter 10 Network Models 10.23 Minimal Spanning Tree = 101 10.25 Cost = 46 10.26 Cost = 69 10.27 Cost = 1310
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/13/2011 for the course COP 4355 taught by Professor Koslov during the Spring '10 term at University of Florida.

Page1 / 4

Linear Prog COP4355_Part_27 - Chapter 10 Network Models 112...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online