Linear Prog COP4355_Part_50

Linear Prog COP4355_Part_50 - Chapter 17 Simulation 204...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Chapter 17 Simulation 17.13 (continued) Foundation Frame Roof House RN Days RN Days RN Days 1 83 1.57 00 3 70 3.5 2 36 2.5 92 5 28 2.5 3 51 1.5 35 4 95 4.0 4 38 1.5 32 4 85 3.5 5 52 1.5 33 4 02 2 6 58 1.5 59 4 17 2 7 19 1.25 42 4 28 2.5 8 63 1.75 78 4 57 3 9 87 1.75 26 3 08 2 10 86 1.75 62 4 94 4 Foundation Frame Roof House Start End Idle Start End Idle Start End Idle 1 0 1.75 0 1.75 4.75 1.75 4.75 8.25 4.75 2 1.75 3.25 0 4.75 9.75 0 9.75 12.25 1.5 3 3.25 4.75 0 9.75 13.75 0 13.75 17.75 1.5 4 4.75 6.25 0 13.75 17.75 0 17.75 21.25 0 5 6.25 7.75 0 17.75 21.75 0 21.75 23.75 0.5 6 7.75 9.25 0 21.75 25.75 0 25.75 27.75 2 7 9.25 10.5 0 25.75 29.75 0 29.75 32.25 2 8 10.5 12.25 0 29.75 33.75 0 33.75 36.75 1.5 9 12.25 14 0 33.75 36.75 0 36.75 38.75 0 10 14 15.75 0 36.75 40.75 0 40.75 44.75 2 ___ ___ ___ 0 1.75 15.75 Total non-productive time = 1.75 + 15.75 = 17.5 days. Total cost = 17.5 x $500 = $8,750. 17.14
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/13/2011 for the course COP 4355 taught by Professor Koslov during the Spring '10 term at University of Florida.

Page1 / 4

Linear Prog COP4355_Part_50 - Chapter 17 Simulation 204...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online