Assignment 4-1

Assignment 4-1 - Assignment 4-1. 1 Assignment 4-1. Natalya...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Assignment 4-1 . 1 Assignment 4-1. Natalya Kadolina ACCT 425-V1FF Eddie Chen 9/27/2011
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Assignment 4-1 . 2 1. The main difference between data flow diagrams and flowcharts is the representation of the physical and logical characteristics of a system. Flowcharts lack to represent the physical characteristics of the system, but data flow diagrams exclude the physical system attributes. I think it is easy to prepare date flow diagrams because they are not as detailed as flowcharts. They have a main frame that does not change with the modifications of a diagram. The also provide a balanced documents how the data flows and what processes happen in the system. On the other hand, I believe it is easier to interpret the flowcharts because all the details and changes are reflected on the chart, so the reader can identify what physical components are used. 2. While the purpose of task level modeling is to record the data flow of the enterprise, the business process level modeling has the aim of designing the enterprise database. Task
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/14/2011 for the course ACCT 425 taught by Professor Terawooten-tanner during the Fall '10 term at Franklin.

Page1 / 3

Assignment 4-1 - Assignment 4-1. 1 Assignment 4-1. Natalya...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online