Economics Program Mr. Miles Julian, Consultant (30 + Year duPont Employee)
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Venture Guidance Appraisal (VGA) Factors Note: If the basic plant equipment is made of exotic materials (e.g. Hastelloy, glass-lines, Teflon-lined, silver, titanium, etc.) or if it contains a lot of expensive rotating equipment, the factors will be toward the lower end of their ranges. If the basic plant equipment is made of carbon steel (with maybe some stainless steel) the factors will be toward the middle or upper end of their range. Miscellaneous Equipment 0% 15% (Relief devices, filters seal pots, flash drums): Field Material (nuts,bolts, pipe hangars): 3% 8% Installation: 5% 15% Insulation: 0% 15% Low End High End
Background image of page 2
Foundation(Concrete Pads, 5% 15% (if piling req’d) Piping (incl. Valves, flanges, insulation): 15% 100% 10% 75% (if incl.digital control) Electrical (incl. motors, substations:
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
Background image of page 5
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 5% 30% lighting) D&R (Dismantling & Rearranging) 0% 10% (new site) (existing site) Site Development (clearing, grading, 0% 10% roads, sidewalk) (existing site) (new site) Low End High End Contingency: 15% 50% Labor/Material Split: 30/70% 15/85% (normal) (exotic material) Working conditions (crowded, 0% of labor 15% of labor hazardous, remote location) Freight: 0% of material 2% of material Quality Assurance: 1.5% of material Procurement: 3% of material 4% of material Sales Taxes: 0% of material 6% of material Low End High End Contractor Distributives (taxes, 40% of labor 80% of labor equipment, overhead, profit) Minor Changes (after startup, 0% 5% to make required production & quality) Engineering & Home Office 14% 25% (design, estimating, cost control, scheduling, overhead) Field Indirects (contract administration): 2% 10% Low End High End...
View Full Document

Page1 / 5

class 16 - 5% 30% lighting) D&R (Dismantling...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online