Downing Engineering Building -MEP Data Collection

Downing Engineering Building -MEP Data Collection - HVAC...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: HVAC Equipment Audit Howard University Washington D.C. Facility Condition Assessment Building: Downing Enginee 2/8/2011 N umber: Inventory Condition Assessment Room Number Item No. Item Serves Photo # Photo Date HP Comments / Recommendations _Outside Condensing Units 2000 2016 F $6,000.00 3 1 unit is dam aged and non functional _Outside Refrigerant Piping Insulation 1996 2011 P $1,500.00 4 Needs replaced _Ground Flr General Exhaust Original 2011 P $6,000.00 3 Al rusted, not working G18A Steam Main Valve Original 2021 F $7,250.00 2 G18A 1/3-2/3 PRV Station 1996 2021 F $14,000.00 2 Top bypass leaks G18A Condensate Receiver System 5 (2) 2000 2021 G $11,500.00 2 G18A Wal Propel er Fan Original 2011 P $1,200.00 4 G18A Hydronic Heat Exchanger 160 gal 2006 2021 F $5,500.00 3 G21B Car ier Absorbtion Chil er 230 tons 2008 2011 P $210,000.00 3 Purging continuously G21B Pum p # 1-Chil ed Water 15 564 gpm 2008 2026 G $6,500.00 3 VFD not m odulating; G21B Pum p # 2- Standby 15 564 gpm 2008 2026 G $6,500.00 3 G21B Pum p # 3- Condenser Water 15 564 gpm 2008 2026 G $6,500.00 3 No insulation; G21B Basin Sweeper Cooling Tower 3 2000 2026 G $7,000.00 3 G21B Prim ary Pum p 2000 2011 P $6,500.00 3 Replace/repair G21B York Chil er Chem istry Bldg 180 tons 2000 2026 F $100,000.00 3 G21B Condenser Water Pum p 15 2000 2021 G $6,500.00 3 G21B Condensate Receiver System 1/3 (2) 2000 2021 G $7,000.00 G21B AHU-1 Lecture Hal /Chem istry 1996 2026 G $13,000.00 3 Clean coils G21B Condensate Receiver System 3/4 (2) 2000 2021 G $7,000.00 3 _Al Areas Heat Pum ps w/Auxil ary HW 2008 2026 G $7,000.00 3 Equipm ent is good, but not operating properly _Al Areas Heat Pum ps 2008 2026 G $6,000.00 3 _Al Areas Horizontal Fan Coils 2000 2021 G $1,900.00 4 _Al Areas Vertical Fan Coils 2000 2021 G $1,500.00 4 _Al Areas Electric Unit Heaters Restroom s 2000 2021 G $800.00 4 _Al Areas Fin Tubes Lobby 1996 2021 G $450.00 4 G9B-2 AHU-1 Nanotechnology Lab 1996 2021 G $7,000.00 3 Data Liebert CRAC Unit 10 tons 2006 2021 G $40,000.00 3 MN-137 Liebert CRAC Unit 5 tons 2006 2021 G $8,000.00 1107 Split System 2006 2021 G $3,000.00 Roof Rooftop Unit- DX Cooling Only 20 ton 2000 2018 F $30,000.00 3 Roof Rooftop Unit- Gas Heat, DX Cooling 15 ton 2000 2026 G $21,000.00 3 Tag No. (CSI No.) Approx Size/Capacity Instal ation (Year) Replace in (Year) Condition (E/G/F/P) Estimated Repl. Cost (Ea.) Urgency Score Mission Score Electrical Equipment Audit Howard U niversity W ashington D.C . Facility C ondition Assessm ent B uilding: Dow ning Engineering B uilding - 2/8/11 Inventory Condition Assessm ent Room Number Item No. Item Type Comments / Recommendations B asem ent Cor idor By G 022 Panel L-3 Kinney 2018 F $2,811.60 3 30 space, old breakers Panel PA-6 Kinney 2012 F/P $6,012.00 3 M issing cover, no lock cover lock G 18A M ech Room Panel Square D 2012 P $2,811.60 3 30 space, has a couple double breakers Snack Bar Disconnect Breaker U nknown 100 A CB 2012 P $1,000.00 4 Oxidation on cover, lockable B6 Starter/Disconnect...
View Full Document

This note was uploaded on 11/16/2011 for the course MGMT 021 taught by Professor Dr.lacy during the Fall '11 term at Howard.

Page1 / 4

Downing Engineering Building -MEP Data Collection - HVAC...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online