Lab 4 graph and table

Lab 4 graph and table - 106.3 5% Flow Rate Discharge Head...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Pumping Plant Efficiency Evaluation Lift TDH Output Input Flow Rate TDH Q (gpm) L (ft) H (ft) (ft) Hp T (sec) Hp PPE (%) Q (gpm) (ft) PPE (%) 2300 11.6 1.16 12.8 7.41 56.5 24.62 30% (We are omitting this row of data) 2300 12.8 30% 2000 11.6 4.62 16.2 8.19 48.3 28.8 28% 2000 16.2 28% 1800 11.6 32.3 43.9 19.95 44.4 31.33 64% 1800 43.9 64% 1400 11.6 41.6 53.2 18.81 43.0 32.35 58% 1400 53.2 58% 1200 11.6 46.2 57.8 17.52 42.7 32.58 54% 1200 57.8 54% 800 11.6 64.7 76.3 15.41 35.5 39.18 39% 800 76.3 39% 500 11.6 83.2 94.8 11.97 30.3 45.91 26% 500 94.8 26% 100 11.6 94.7 106.3 2.68 27.6 50.4 5% 100
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 106.3 5% Flow Rate Discharge Head Time for 5 Revs Pump Plant Efficiency Pump Plant Efficiency 100 300 500 700 900 1100 1300 1500 1700 1900 2100 2300 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 0% 10% 20% 30% 40% 50% 60% 70% Lab 4 - Pump Testing Lab TDH (ft) Pump Plant Efficiency PPE (%) Flow Rate - GPM Total Dynamic Head (TDH) - ft. Pump Plant Efficiency (PPE) - %...
View Full Document

This note was uploaded on 11/18/2011 for the course BRAE 433 taught by Professor Styles during the Fall '10 term at Cal Poly.

Page1 / 2

Lab 4 graph and table - 106.3 5% Flow Rate Discharge Head...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online