Page1 / 2

Lesson 18 Material Requirements Planning Q&A Random Selection14

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Lesson 18 Material Requirements Planning Q&A Random Selection14

Lesson 18 Material Requirements Planning Q&A Random Selection14

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Generate Random Question
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
table index nbr 2 # Questions 31 Rand # Question Rand() 1 2 3 4 5 1 2 #VALUE! 0.90276174 Lesson Question Nbr Prob Question Nbr Prob 2 41 41 0.0322581 2 42 42 0.0322581 2 43 43 0.0322581 2 44 44 0.0322581 2 45 45 0.0322581 2 46 46 0.0322581 2 47 47 0.0322581 2 48 48 0.0322581 2 49 49 0.0322581 2 50 50 0.0322581 2 51 51 0.0322581 2 52 52 0.0322581 2 53 53 0.0322581 2 54 54 0.0322581 2 55 55 0.0322581 2 56 56 0.0322581 2 57 57 0.0322581 2 58 58 0.0322581 2 59 59 0.0322581 2 60 60 0.0322581 2 61 61 0.0322581 2 62 62 0.0322581 2 63 63 0.0322581 2 64 64 0.0322581 2 65 65 0.0322581 2 66 66 0.0322581 2 67 67 0.0322581 2 68 68 0.0322581 2 69 69 0.0322581 2 70 70 0.0322581 2 71 71 0.0322581 XON 41. Which of the fol owing most closely describes dependent demand? A. demand generated by suppliers B. estimates of demand using regression analysis of independent variables C. derived demand D. demands placed on suppliers by their customers E. net material requirements 42. ERP implementation probably won't require: A. cross functional teams B. more than three or four months to instal C. intensive training D. high funding for both initial cost and maintenance E. frequent upgrades after instal ation 43. A computer-based information system designed to handle ordering and scheduling of dependent-demand inventories is: A. computer aided manufacturing (CAM) B. computer integrated manufacturing (CIM) C. economic order quantity (EOQ) D. material requirements planning (MRP) E. economic run size (ERS) 44. The development and application of MRP depended upon two developments: (1) the recognition of the dif erence between independent and dependent demand, and (2): A. computers B. development of the EOQ model C. inventory control systems D. blanket purchase orders E. the internet 45. The output of MRP is: A. gross requirements B. net requirements C. a schedule of requirements for al parts and end items D. inventory reorder points E. economic order quantities and reorder points 46. Which one of the fol owing is not an input in an MRP system?
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.
Ask a homework question - tutors are online