Role of the QS Prior to construction work commencing
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Learning Outcomes By the end of this session you will have a basic understanding of the QS’s role at the following key stages Inception Feasibility Outline Proposals Scheme design Detail Design Production Information Tender for Construction
Background image of page 2
Inception Prepare general outline of requirements Set up client organisation Consider requirements Appoint Architect and core team
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Feasibility Provide Client with » appraisal and recommendations » confirmation of feasibility functionally, technically and technically Carry out studies » user requirements » site conditions » planning » design » cost Known as Client Briefing
Background image of page 4
Outline Proposals Determine general approach » design » construction » layout Further develop brief as necessary » user requirements » site conditions » planning » design » cost Obtain authoritative client approval
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Scheme design Finalise the brief » planning, appearance, construction method, outline specification and cost
Background image of page 6
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 8
Background image of page 9
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: • Full design by Architect • Preliminary engineering design • Preparation of cost plan • Full explanatory report • Submission of proposals for approval • BRIEF SHOULD NOT NOW BE MODIFIED Detail Design • Full design of every part and component of the building • Collaboration of all parties concerned • Obtain final decision on all matters of » design, specification, construction, cost • Produce Working Drawings • ANY CHANGES OF SIZE, LOCATION, SHAPE OR COST AFTER NOW WILL RESULT IN ABORTIVE WORK Production Information • Make final detailed decisions to carry out work • Preparation of final production information » drawings » schedules » specifications Tender for Construction • Prepare and complete all information • Preparation of Bills of Quantity • Preperation of Tendering documentation • Tender appropriate construction firms • assess bids • award the contract...
View Full Document

This note was uploaded on 11/24/2011 for the course SUR BLD115 taught by Professor Chapman during the Fall '11 term at Uni. Ulster.

Page1 / 9

The Development Process week 7 QS 2 - • Full design by...

This preview shows document pages 1 - 9. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online