HW 4 Solutions

HW 4 Solutions - Transportation Homework Solutions STOR 112...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Transportation Homework Solutions STOR 112 35 points written work + 15 points computer work and Kentucky to four generating plants in North Carolina. The following table lists the supplies of coal available at the three mines (in tons) and the demands for coal at the four generating plants (also in tons) and the shipping cost from each mine to each plant (in dollars per ton). The 3-by-4 table lists the shipping cost from any of the mines to any of the plants. Plant 1 Plant 2 Plant 3 Plant 4 100 75 45 80 MINES Mine 1 120 $24 $30 $27 $32 Mine 2 85 $29 $19 $21 $36 SUPPLIES Mine 3 125 $26 $29 $20 $18 SHIPPING COSTS (per ton) does not exceed the supply, the amount shipped to each plant meets the demand, and the total shipping cost is minimized. 1. (10 points) Formulate a linear program to determine the optimal shipping schedule.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/27/2011 for the course STOR 112 taught by Professor Rubin,david during the Fall '06 term at UNC.

Page1 / 2

HW 4 Solutions - Transportation Homework Solutions STOR 112...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online