Lacey Mowery November 21, 2011 4048879 Case Study Week 3 C-3 Use Parts 1 and 2 of the case study in Appendix B, Topic A, named Billing System Conversion Project and create a WBS for the conversion project. D-1 How would you determine how much work is required for the Billing System Conversion project? I would use the level of the branch to determine responsibilities of a technical, scheduling, and cost element. Each level would require a different amount of work effort depending on the element. For example, if it took 30 minutes for one employee to train another employee on the new system, and there were 50 employees, Billing Conversion Award contract Install new software on existing servers Install 1000 new PCs Customize new software Test new billing software Convert old data into new systems Training employee users Evaluate performance
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Lacey Mowery November 21, 2011 4048879 the work hours would be 50 because 2 people are being paid for one half-hour which would equal a total of one hour to the project. D-4
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/29/2011 for the course ITMG 321 taught by Professor Krueller during the Spring '11 term at American Public University.

Page1 / 3

Week 3 Case Study_Mowery Lacey - Lacey Mowery November 21,...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online