sched - set SHIFTS; param Nsched; s set SCHEDS = 1..Nsched;...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: set SHIFTS; param Nsched; s set SCHEDS = 1..Nsched; # shifts # number of schedules; # set of schedules s set SHIFT_LIST {SCHEDS} within SHIFTS; param rate {SCHEDS} >= 0; p param required {SHIFTS} >= 0; minimize Total_Cost; s subject to Shift_Needs {i in SHIFTS}: to_come >= required[i]; var Work {j in SCHEDS} >= 0, obj Total_Cost rate[j], coeff {i in SHIFT_LIST[j]} Shift_Needs[i] 1; ...
View Full Document

This note was uploaded on 11/29/2011 for the course ORIE 5900 taught by Professor Caggiano during the Fall '11 term at Cornell University (Engineering School).

Ask a homework question - tutors are online