HW_11_ELo - SYSEN 510: Applied Systems Engineering Fall...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: SYSEN 510: Applied Systems Engineering Fall 2011 Homework #11 Due Date: Monday, 11/15/11 1. Six Sigma Problem A) Sigma=sqrt(sigma1^2+sigma2^2+sigma3^2) so 0.15=sqrt(0.1^2+0.001^2+sigma3^2) and sigma3=0.1179m B) Variation must be 0.5m and the current std is 0.15m. Variation is std squared so the process should have a std of +/- 0.707. This means yes the current manufacturing process does meet the requirement since it is significantly lower than 0.707. 2. MTBF Calculation (a) For a system of 2 LED lights, MTBF(system)=(1500000)/2= 750000 hours (b) MTBF(system)=(100(1/1500000)+1/2000))^-1= 1764.7 hours (c) MTBF(system without 100 old lights)=2000 MTBF (system with 100 old lights)=1000 MTBF(system with 100 old lights)=(1/MTBF(system without 100 old lights) +1/MTBF(100 old lights))^-1 MTBF(100 old lights)=2000 hours MTBF(1 old light)= 2 hours 3. Probability Exercises (a) P(A and B) = P(A)*P(B)= .45 (b) P(A and B and C)=P(A)*P(B)*P(C)= 0.006 (c) P((A and B) or C)=P(A)P(B)+P(C)= 0.32 (d) P(A and B)=P(B)*P(A|B)= 0.2 (e) P(B|A)?---P(A)*P(B|A)=P(B)*P(A|B) so P(B|A)=P(B)P(A|B)/P(A)=(e) P(B|A)?...
View Full Document

Page1 / 3

HW_11_ELo - SYSEN 510: Applied Systems Engineering Fall...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online