SYSEN 510: Applied Systems Engineering Eddie Lo ecl88 2840681 Homework #13 Index Card Question from Lec 25 Critical path is the longest path comprised of required tasks in series, so it changes from “remove internals” to “install external wiring” since it is now 20 weeks. The original critical-path length goes from 23 (=3+4+6+3+4) to the new critical-path length of 27 (=20+3+4). Index Card Question from Lec 26 Least favorite or least value-added system engineering process in my opinion is creating use-case diagrams, since to me they seem redundant of functional flow block diagrams. Another process I did not like was the IDEO graphs as they were complicated and cumbersome. 1. Troubleshooting a) For a senior project, my team and I were trying to develop a vulnerability metric measurement interface for our Cisco client; the failure was the tool we developed was unable to read the raw data we fed into the system despite several days’ worth of coding and debugging. As a result, we had to delay our time table and we were unable to complete
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/29/2011 for the course SYSEN 5110 taught by Professor Peck during the Fall '11 term at Cornell.

Page1 / 2

HW_13_ELo - SYSEN 510 Applied Systems Engineering Eddie Lo...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online