F11_hw11 - Short lateral diameter = 4 in each Total number...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
ENV 4561 Fall 2011 Homework # 11 Assigned: November 10, 2011 Due: November 17, 2011 A 9 MGD wastewater treatment plant with two sedimentation basins wants to analyze the following options: 1. Use the hydraulic analysis based upon exit and entrance losses to determine the flow distribution in the following flow dividing manifold: Manifold pipe diameter = 8 in
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Short lateral diameter = 4 in each Total number of short laterals = 12 2. Determine the flow distribution in the following rectangular side weir configuration: Number of weirs = 10 Length of weir = 3 ft Height of each weir above the channel bottom = 4 ft Width of channel = 6 feet...
View Full Document

This note was uploaded on 11/29/2011 for the course ENV 4561 taught by Professor Zoltek during the Fall '08 term at University of Florida.

Ask a homework question - tutors are online