MIT4_42JF10_project - 4.42J Design Project 1 Due November 3 2010 In Class at 11:00 AM MIT has undertaken a program to improve the energy efficiency

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 4.42J Design Project 1 Due: November 3, 2010 In Class at 11:00 AM MIT has undertaken a program to improve the energy efficiency of all existing buildings. Through a cooperative agreement with the electrical utility NSTAR, MIT will be rewarded for each efficiency improvement that can be documented. You are asked to pick one building or wing of an existing building on campus and focus on one or two particular inefficient energy features such as exits doors. You are asked to access the current energy use, develop redesigns of components or operations that substantially improve energy efficiency and predict the energy savings and economics of these new designs. The new concepts should an outstanding sustainable design that is also financially sound. In Design Projects 1 and 2 you are asked to select a building and propose and assess innovative building designs, technologies and operating schemes that will yield an outstanding sustainable building. For Design Project 1 you should first collect basic information about the sustainable building....
View Full Document

This note was uploaded on 11/29/2011 for the course CIVIL 1.018j taught by Professor Markusbuehler during the Fall '08 term at MIT.

Page1 / 3

MIT4_42JF10_project - 4.42J Design Project 1 Due November 3 2010 In Class at 11:00 AM MIT has undertaken a program to improve the energy efficiency

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online