Ch3%20Work%20Breakdown%20Structure%20Example

Ch3%20Work%20Breakdown%20Structure%20Example - 4.2 Document...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Project Management – Work Breakdown Structure Example Work Breakdown Structure Example 1. Product Identification and Selection 1.1 System Service Request evaluation 1.1.1 Develop SSR 1.1.2 Analyze SSR by Systems Priority Board 1.1.3 Assign SSR disposition 1.1.4 Allocate resources for Project Initiation and Planning phase 1.2 Establish project management procedures and modifications to SDM 2. Project Initiation and Planning phase 2.1 Develop project plan 2.1.1 Develop overview of user requirements 2.1.2 Analyze stakeholders and risks 2.1.3 Construct work plan 2.1.4 Describe resource requirements for Analysis phase 2.2. Develop business case 2.3 Review Project Initiation and Planning phase * 3. Analysis phase 3.1 Determine requirements 3.2 Structure requirements 3.3 Select system direction 3.4 Refine business case 3.5 Update project plan 3.6 Review Analysis phase * 3.6.1 Review work done to date 3.6.2 Review updated business case 3.6.3 Allocate resources for Logical Design phase 4. Logical Design phase 4.1 Document information flows
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 4.2 Document data requirements 4.3 Document processing logic 4.4 Document user interfaces 4.5 Refine business case 4.6 Update project plan 4.7 Review Logical Design phase * 4.7.1 Review work done to date 5. Physical Design phase 5.1 Select technology 5.2 Design database and files 5.3 Design programs 5.4 Develop test plan 5.5 Plan installation 1 Project Management Work Breakdown Structure Example 5.6 Refine business case 5.7 Update project plan 5.8 Review Physical Design phase * 5.8.1 Review work done to date 5.8.2 Allocate resources for Implementation phase 6. Implementation phase 6.1 Programming 6.2 Testing 6.3 Education 6.4 Documentation 6.5 Installation 6.6 User acceptance testing 6.7 Final installation 6.8 Project termination 6.8.1 Evaluate personnel 6.8.2 Review project with management 6.8.3 Release personnel 7. Maintenance 7.1 Annual system review 7.2 System audits 7.3 Submit System Service Requests for system changes 2...
View Full Document

This note was uploaded on 12/05/2011 for the course IST 352 taught by Professor Staff during the Fall '10 term at Syracuse.

Page1 / 2

Ch3%20Work%20Breakdown%20Structure%20Example - 4.2 Document...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online