B361 - material costsTotal cost 500 4 pre bake 252 3.05...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
asp 22 labor/hours 11.75 wood 1.07 btu 0.44 output finished products 910 1050 labor 320 275 input wood 975 940 btu 2340 2720 productivity units per labor hour 2.84 revenue per labor dollar 77.45 7.15 units per linear foot of wood 5.32 units per btu revenue per input dollar  $3.43   $4.25  23.86% old new output 4 6 input 6 5 productivity 0.67 1.20 improvement 80.00% 1.49 0.49
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
fixed costs labor costs
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: material costsTotal cost 500 4 pre bake 252 3.05 0.15 $752.00 $330.05 $1,248.00 $917.95 easy bake 309 1.9 0.08 $310.90 $350.90 $1,689.10 $1,338.20 speed bake 539 1.61 0.11 $540.61 $595.61 $1,459.39 $863.78 $1,276.56 $4,396.49 46.72 difference $(420.25)...
View Full Document

This note was uploaded on 05/26/2011 for the course ACCOUNTING 101 taught by Professor Smith during the Spring '11 term at San Diego State.

Page1 / 3

B361 - material costsTotal cost 500 4 pre bake 252 3.05...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online