Assignment 1 - G 11.0 0.11 J 14 16 20 C 16.3 1.00 K 2 8 10...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Operations Management Mengheng Li Instructor: Orrin Cooper TuTh 3:30PM ID: 3589940
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
3.14 Time (days) Activity a m b Immediate redecessor(s) Expected Time Variance A 3 6 8 5.8 0.69 B 2 4 4 3.7 0.11 C 1 2 3 2.0 0.11 D 6 7 8 C 7.0 0.11 E 2 4 6 B, D 4.0 0.44 F 6 10 14 A, E 10.0 1.78 G 1 2 4 A, E 2.2 0.25 H 3 6 9 F 6.0 1.00 I 10 11 12
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: G 11.0 0.11 J 14 16 20 C 16.3 1.00 K 2 8 10 H, I 7.3 1.78 Critical Path: 36.3 b) Project completion time: 36.3 days Critical path: C-D-E-F-H-K d) Goal 40 z score 0.61 Probability 72.9% 15...
View Full Document

This note was uploaded on 12/03/2011 for the course BUSQOM 1070 taught by Professor Shang during the Spring '09 term at Pittsburgh.

Page1 / 3

Assignment 1 - G 11.0 0.11 J 14 16 20 C 16.3 1.00 K 2 8 10...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online