EGN_5623 Rough-cut Planning 10-29-11

EGN_5623 Rough-cut - inSCM (ProfessionalMSEM Fall,2011 inSCM Theories&Concepts (ProfessionalMSEM Fal

Info iconThis preview shows pages 1–12. Sign up to view the full content.

View Full Document Right Arrow Icon
Rough-Cut Capacity Planning  Rough-Cut Capacity Planning  in SCM in SCM      EGN 5623   Enterprise Systems Optimization  EGN 5623   Enterprise Systems Optimization (Professional MSEM) (Professional MSEM) Fall, 2011  Fall, 2011 
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Rough-Cut Capacity Planning  Rough-Cut Capacity Planning  in SCM in SCM  EGN 5623   Enterprise Systems Optimization  EGN 5623   Enterprise Systems Optimization (Professional MSEM) (Professional MSEM) Fall, 2011  Fall, 2011 
Background image of page 2
Hierarchical Planning Framework  Hierarchical Planning Framework  (review) (review) Long term -Material programs - Supplier selection - Cooperation - Plant location - Production systems - Subcontractors - Physical distribution structure - Transportation strategy - Product program - Strategic sales planning -- Personnel training -- Contracts -- Material Requirements Planning -- Master production Scheduling -- Capacity planning -- Distribution planning -- Mid-term sales planning Mid term -- Personnel scheduling -- Material ordering -- lot-sizing - operations scheduling - shop floor control - Warehouse replenishment - Transportation planning -- Mid-term sales planning Short term EXECUTION Information Feedback Flow of goods
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
The APICS-Standard Planning Framework  The APICS-Standard Planning Framework  (review) (review)
Background image of page 4
Production Process (review) Production Process (review) Requirements for Production Planning: to meet the demand to consider the resource capacities and the material availabilities to improve utilisation of the resources to lower the setup time to minimize the stock, and to minimize the work in process (WIP) to improve stability of the plan
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Rough-cut Capacity Planning Rough-cut Capacity Planning The main goal in rough-cut capacity planning is to identify where overloading or under-loading of production capacity occurs and revise the MPS as required. Overloading means that too much production of products has been planned in the facility and insufficient capacity exists to produce planned quantities of products required in MPS. Under-loading means that not enough production of products has been planned to fully load the facility.
Background image of page 6
Rough-Cut Capacity Planning in APO- Rough-Cut Capacity Planning in APO- SNP SNP
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Order Life Cycle for Make-to-Stock Order Life Cycle for Make-to-Stock
Background image of page 8
Order Life Cycle for Make-to-Order Order Life Cycle for Make-to-Order
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Forecast Consumption Mode and  Forecast Consumption Mode and  Horizon Horizon (Backword consumption of 4 days and a forward consumption of 3 days)
Background image of page 10
Transactional Data for Transferring Transactional Data for Transferring Starting from a demand plan, SNP checks the resource capacities and delivers a medium/long-term plan for the estimated sales volumes. The plan includes the quantities to be transported
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 12
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/03/2011 for the course EGN 5623 taught by Professor Chen during the Fall '11 term at FIU.

Page1 / 55

EGN_5623 Rough-cut - inSCM (ProfessionalMSEM Fall,2011 inSCM Theories&Concepts (ProfessionalMSEM Fal

This preview shows document pages 1 - 12. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online