PAST EXAM: 1) Which of the following most closely describes dependent demand? derived demand 2) the output of MRP is: a schedule of requirements for all parts and end items 3) which of the following is NOT an input in MRP? planned order schedule 4) in MRP master schedule, the planning horizon is often separated into series of time periods called time buckets 5) a visual depiction of the subassemblies and components that are needed to produce and/or assemble a product product structure tree 6) which 1 of the following most closely describes net material requirement? gross requirements - amount OH - scheduled receipts 7) which of these products would most likely to have dependent demand? automobile engines 8) the lean philosophy suggests that workers are: a) assets 9) the ultimate goal of lean operation: a) no unprocessed inventory b) cross trained workers c) smooth rapid flow d) no set up times e) all above 10) in lean philosophy, the ideal lot size is ONE 11) a conveyance ____ signals parts moving a) requests b) routing c) barcode d) kanban e) kaizen 12) the 5 s's don't include: sanitize 13) the kaizen philosophy applies to a) employee development b) safety stock c) waste d) SCM e) MRP2 14) which of the following is a characteristic of lean philosophy? a) inventory asset b) lot size are optimized c) vendors are coworkers, depart of org d) queues are necessary E) all above 15) in project network analysis "slack" refers to difference between? a) observed/predicted times b) optimistic/pessimistic times c) mean/modal d) finish/start e) earliest/latest 16) sequence of activities that leads from the starting node to the finishing is PATH 17) which is determined as a direct result of computing the earliest starting and finishing times for activities of a project network a) expected project duration b) activity slack time c) which activities are on the critical path d) variance in project duration e) max project duration 18) the higher the node # the longer the activity will take? true/false? 19) if 17 p's are needed and no on hand inventory, how many c's? 272 **show from paper #78 20) what is the net requirement of dark chocolate truffles to fill order? a) 100 b) 140 c) 150 d) 180 E) 200 150
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
21) when should an order for carved chocolate eggs be released? a) at the start of week 2 22) the all seasons comp uses 3200 glass jars at 1 of its jar filling stations each 8 hrs of production. the cycle time for a standard container, which holds 90 jars, averages 45minutes. If mgmt uses an efficiency factor of 20%, how many containers should be used? a) 6 b) 2 c) 3 d) 4 e) 5 23) the 4 star publishing company uses 6 reams of paper each hour at one of its high speed printing stations. the cycle time for a standard container, which holds 15 reams of paper averages 40 minutes. If management has decided to use 3 containers what efficiency factor was applied? a) 12.5 b) 13 c) 11.5 d) 11 E) 10
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/06/2011 for the course GLOBAL SUP 3600 taught by Professor Allen during the Spring '11 term at Ohio State.

Page1 / 9

Global Supply Chain - PAST EXAM 1 Which of the following...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online