Flexibility and Capacity Planning What is flexibility? GM examples Lessons from Flex Cap software Flex Cap model Flexibility principles Reference – Jordan, Graves “Principles on the Benefits of Manufacturing Process Flexibility,” Management Science, April 1995 Stephen C. Graves Copyright 2005 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
What is flexibility? Ability to respond to change What type of changes? Demand volume Demand mix Product features Process or technology changes Job priorities Process yield How responsive? Stephen C. Graves Copyright 2005 2
Background image of page 2
How to achieve flexibility? Flexible processes Short setups or changeovers Flexible work force Excess capacity Overtime Out sourcing or subcontracting Product design, e. g., modularity, common components, postponement Contracts, e.g., options Stephen C. Graves Copyright 2005 3
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
BACKGROUND Forward planning in automotive industry for allocating products to assembly plants Flexibility: Ability to build different product types in the same plant at the same time Motivation: Product demand is VERY uncertain. average forecast error > 50% ! Cost of unfilled demand or poorly utilized capacity is very high. Flexible capacity is very expensive. Stephen C. Graves Copyright 2005 4
Background image of page 4
BOC MY PRODUCT ALLOCATIONS ASSEMBLY CARLINES PLANTS CHEV J LORDSTOWN PONT J LINDEN L CAR WILMINGTON PONT N LANSING A OLDS N LANSING B BUICK N PONT H BUICK CITY OLDS H BUICK H WENTZVILLE BUICK C OLDS C ORION CAD C BUICK E HAMTRAMCK OLDS E CAD E/K IS THIS ENOUGH FLEXIBILITY? Stephen C. Graves Copyright 2005 5
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
PLANNING VOLUME UNCERTAINTY PLANNING VOLUMES FOR MY 85-89 NAMEPLATE- CARLINES COMPARED TO ACTUAL PRODUCTION: Stephen C. Graves Copyright 2005 6
Background image of page 6
Image of page 7
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/06/2011 for the course ESD 15.763j taught by Professor Davidsimchi-levi during the Spring '05 term at MIT.

Page1 / 34

flexcap - Flexibility and Capacity Planning What is...

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online