Melissa McCarty IT/205: Hardware Replacement Project University of Phoenix First off, the project could start with a project management plan. Project management activities include planning the work, assessing risk, estimating resources required to accomplish the work, organizing the work, acquiring human and material resources, assigning tasks, directing activities, controlling project execution, reporting progress, and analyzing the results (Laudon & Laudon, 2009). One should always consider five major variables: scope, time, cost, quality, and risk. The first steps in the process is to determine what changes will and will not be included. In this case, the Information Technology department needs to replace the software within its corporate offices that manages their customer relationships. This is going to require upgrading the hardware that drives that system. Time is always a concern with any project especially one of this size. If the scope consists of upgrading or modifying one computer, the time factor can be unsuccessful. Although, if the scope requires replacing an entire network; the timeframe can be quite extensive. Cost is also greatly dependent upon the scope. The cost is directly related to the scope because the smaller the scope, the smaller the cost and so on. The actual scope of the project will determine the cost. We need to also question if the product will meet the objectives that have been outlined. The quality of the new system should be one of the first items to be considered. Many different customer relationships management packages exist. Research is commonly required to determine this factor. A bad decision can result in a huge loss of existing and future revenue. If a company does not plan correctly, there are several factors that can cause havoc
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
within the enterprise. It is important to have the best understanding of all the variables in order to make this type of project successful. It is not unlike any other IT project that a company may take on. Knowing the options for the hardware and their associated costs will help management
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/09/2011 for the course IT 205 IT 205 taught by Professor Taylor during the Spring '09 term at University of Phoenix.

Page1 / 5

Melissa Wk 8 Hardware Replacement Project - Melissa McCarty...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online