10-11 - C 1 4 7#ADDIN F Install pollution control system C 1 2 9#ADDIN G Install air pollution device D E 3 4 11#ADDIN H Inspect and test F G 1 2

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
General Foundry's Project (Using Crystal Ball) Calculations set to Manual. Run model using Crystal Ball to recalculate simulation values. Activity Description A Build internal components 1 2 3 ### 0.00 #ADDIN? B Modify roof and floor 2 3 4 ### 0.00 #ADDIN? C Construct collection stack A 1 2 3 ### ### #ADDIN? D Pour concrete and install frame A, B 2 4 6 ### ### #ADDIN? E Build high-temperature burner
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: C 1 4 7 ### ### #ADDIN? F Install pollution control system C 1 2 9 ### ### #ADDIN? G Install air pollution device D, E 3 4 11 ### ### #ADDIN? H Inspect and test F, G 1 2 3 ### ### #ADDIN? Immed. pred. Optimistic time (a) Most likely time (m) Pessimistic time (b) Activity time Start time Finish time...
View Full Document

This note was uploaded on 12/10/2011 for the course INSY 4508 taught by Professor Graham during the Spring '10 term at Bentley.