Fall2011Quiz5ACh15_16wAnswers

Fall2011Quiz5ACh15_16wAnswers - Fall2011-Quiz#5A...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Fall 2011 - Quiz #5A - Chapters 15 and 16 Name___________________________________ MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) Forward scheduling is the scheduling of A) jobs as soon as the requirements are known B) jobs according to their profit contributions C) the start items or component parts D) the final operation first beginning with the due date E) the end items or finished products 1) 2) The assignment method is A) a form of linear programming for optimally assigning tasks or jobs to resources B) a method to highlight overloads in a given work center C) a method for achieving a balance between forward and backward scheduling D) the same thing as the Gantt schedule chart E) a computerized method of determining appropriate tasks for an operation 2) 3) Which of the following is specifically characterized by a focus on continuous improvement, respect for people, and standard work practices? A) Lean operations
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/12/2011 for the course OM 301 taught by Professor Naor during the Spring '09 term at George Mason.

Page1 / 2

Fall2011Quiz5ACh15_16wAnswers - Fall2011-Quiz#5A...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online