LA023654_Assn4_Answer sheet_CPCCBC4011B_Ed4.docx -...

This preview shows page 1 - 3 out of 5 pages.

CPCCBC4011B: Assessment 4 Answer sheet Please type your answers in black font. (Calibri 12 point) STUDENT DETAILS Student Name: __________________________TAFE ID: ___________________ UNIT AND ASSESSMENT DETAILS Unit Number: ___________________________Assessment No: ________________ LA Number: _________________ DECLARATION I hold a copy of this assessment. I have completed all parts of the assessment. I hereby certify that no part of this assessment or product has been copied from any other student’s work or from any other source except where due acknowledgement is made in the assessment. Student’s signature: _________________________________________ (Electronic Signature is accepted) Note: OTEN has the right to reject your assessment if the above declaration has not been completed. LA023654, Assessment 4, Answer sheet, CPCCBC4011B, Edition number 4 1 © New South Wales Technical and Further Education Commission, 2019 (TAFE NSW), Version 1, July 2019
What you have to do Please type your answers in black font. (Calibri 12 point) It is recommended that you are familiar with the following resources and standards prior to completing this assessment: o Learning Resources for CPCCBC4011B o NCC Vol 1 o AS1170.1 Structural design actions – Permanent, imposed and other actions o AS1170.2 Structural design actions – Wind actions o AS3850.2 Prefabricated concrete elements – Building Construction o National Code of Practice for Precast, Tilt-up and Concrete Elements in Building Construction o AS3600 Concrete structures o AS4100 Steel structures o Code of Practice: Demolition Work o AS2601 The Demolition of structures You may make any assumptions you need to, but be sure to include them as part of your submission. Task 1 – Wall systems This assessment task is based on the following Project: Project 3 Factory Complex Job Address: 7 Layland Way, Banksia, NSW Job Title: Proposed Factory Units and Office Space Client: Tasmegs Development Pty Ltd Architect: Olympic Designs, 55 Olympic Parade, Homebush, NSW 2140 1. Study the wall system for the external and dividing walls in the factory units and answer the following: a) What type of wall system has been used?

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture