Extra_credit_model

Extra_credit_model - Distance (m) 5 10 15 20 25 30 35 40 45...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
1.5H:1V Coarse Rockfill Tailings Stage 1 Clayey Silt Sandy Silt Stage 2 Bedrock Extra Credit Project Original dam 3H:1V Phreatic surface for original dam Stage 3 2.5H:1V 2.5H:1V 2.5H:1V Collection Ditch
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Distance (m) 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 Elevation (m) 225 227 229 231 233 235 237 239 241 243 245 247 249...
View Full Document

This note was uploaded on 12/14/2011 for the course CEG 4012 taught by Professor Staff during the Fall '08 term at University of Florida.

Ask a homework question - tutors are online