C2150-609.pdf - C2150-609 Dumps C2150-609 Braindumps...

This preview shows page 1 - 3 out of 4 pages.

C2150-609C2150-609 DumpsC2150-609 BraindumpsC2150-609 Real QuestionsC2150-609 Practice TestC2150-609 dumps freeIBMIBM Security Access Manager V9.0 Deployment
Question: 119A customer received a replacement hardware appliance, but on boot up it has a different firmware than that for IBM Security Access Manager (ISAM) V9.0. The appliance needs to be flashed to ISAM V9.0. The appliance needs to be rebooted with abootable USB drive formatted as FAT32.Which file format is needed to create the bootable drive? A Question: 120A risk officer of an organization discovered that a site protected by the IBM Security Access Manager V9.0 solution might be vulnerable to common attacks like cross-site scripting (XSS) and SQL injection.Which optional component should be configured to protect against these attacks? C Question: 121 A stateful junction /WebApp is added to a Web reverse proxy instance with two backend HTTP servers. When one of the backend server stops responding to the requests, the users are getting the "Third Party Not Responding" error message even thoughone of the backend server continues to respond.Which parameter needs to be added to the configuration file so that "Third Party Not Responding" error page is not rendered and the user is connected to the backend server that is responding?

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture