FIT_BUS 5661_Quiz 4

FIT_BUS 5661_Quiz 4 - de is 84 percent has configured this test to allow students to review ons answered incorrectly ons answered correctly ts

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
ade is 84 percent r has configured this test to allow students to review: ions answered incorrectly. ions answered correctly. nts answers. ct answers. True/False ID: 5298171 project manager should recommend that individuals or groups who performed well together on a project as a team be kept togeth True/False ID: 5298129 Communication Tracking Document helps the project manager keep track of commitments made by team members. Multiple Choice ID: 5298160 ect answer has been circled. hen identifying risks, project managers should orm with experts and people with related knowledge ific in the description of the risk sumptions
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
True/False ID: 5298176 audit can be performed at any level of depth, but there are three levels that are the most common. True/False ID: 5298151 e Risk Mitigation Plan is an effective tool to provide a well thought out contingency plan since it was developed prior to the risk Multiple Choice ID: 5298163 portion of a risk management plan contains these plan elements except tors lity Multiple Choice ID: 5298173
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/14/2011 for the course BUS 5661 taught by Professor Lee during the Summer '10 term at FIT.

Page1 / 8

FIT_BUS 5661_Quiz 4 - de is 84 percent has configured this test to allow students to review ons answered incorrectly ons answered correctly ts

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online