Placing and Finishing Concrete Basic Requirements for Placing Concrete (1) Preserve concrete quality Water-cement ratio Slump Air-content Homogeneity Avoid separation of aggregate and mortar
Background image of page 2
Placing and Finishing Concrete Basic Requirements for Placing Concrete (2) Avoid excessive horizontal movement Consolidate adequately Maintain sufficient placement capacity Choose the right equipment for the concrete
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Placing and Finishing Concrete Preparation Before Placing Includes: Trimming the subgrade
Background image of page 4
Placing and Finishing Concrete Preparation Before Placing Includes: Moistening the subgrade
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Placing and Finishing Concrete Preparation Before Placing Includes: Compacting the subgrade
Background image of page 6
Placing and Finishing Concrete Depositing Concrete DO NOT — (a) disturb saturated subgrades so bearing capacity is maintained (b) deposit on frozen subgrade Deposit continuously and as near as possible to its final position Rate of placement should be such that previously placed concrete has not set when the next layer is placed upon it
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Placing and Finishing Concrete Depositing Concrete Start placing along perimeter at one end with each batch discharged against previously placed concrete Do not — (a) dump in separate piles & then level and work together (b) deposit in large piles & then move horizontally into position These practices result in segregation (mortar flows ahead of coarser material) Slab Construction
Background image of page 8
Placing and Finishing Concrete Depositing Concrete Discharging into previously placed concrete Effective use of wheelbarrows
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Placing and Finishing Concrete Incorrect Placement with Conveyor Belt Baffle Mortar Rock Mortar Mortar Rock Shallo w hopper
Background image of page 10
Placing and Finishing Concrete Placement with Conveyor Belt Belt Scraper No Separation Provide at least 0.6 m (24 in.) headroom for downpipe, elephant trunk or equivalent
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Placing and Finishing Concrete Depositing Concrete Pavement Slab Concrete deposited in front of slip form paver by dump trucks Concrete spread evenly across the subgrade by the paver before consolidation and finishing
Background image of page 12
Placing and Finishing Concrete Curb/Curb and Gutter Depositing Concrete Concrete deposited into hopper of slip form curb and gutter machine which then extrudes the concrete into the desired shape
Background image of page 13

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Placing and Finishing Concrete Depositing Concrete Deposit in horizontal layers of uniform thickness Reinforced — 150 mm to 500 mm Mass — 375 mm to 500 mm Consolidate each layer before next is placed Timely placement & consolidation prevents flow lines and cold joints Walls
Background image of page 14
Placing and Finishing Concrete Horizontal Construction Joint
Background image of page 15

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Placing and Finishing Concrete Horizontal Construction Joints
Background image of page 16
Image of page 17
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/15/2011 for the course CM 217 taught by Professor Rogers,m during the Fall '08 term at BYU.

Page1 / 62

Finishin - Placing and Finishing Concrete Basic...

This preview shows document pages 1 - 17. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online