CM 217 Concrete

CM 217 Concrete - CM 217 Concrete & Masonry Construction...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
CM 217 Concrete & Masonry Construction Fall 2011 copy 1 You are logged in as Yi Chen ( Logout ) You are here CMMoodle / ► CM217F11_1 / ► Quizzes / ► Monroe Care Center Quiz / ► Review of attempt 1 Monroe Care Center Quiz Review of attempt 1 Started on Wednesday, 2 November 2011, 10:01 AM Completed on Wednesday, 2 November 2011, 11:57 AM Time taken 1 hour 55 mins Marks 24/40 Grade 30 out of a maximum of 50 ( 60 %) Question 1 Marks: 2 How many lineal feet does the F1 footing span? Your answer should be in a decimal format (i.e. 400.50). Answer: Correct Marks for this submission: 2/2. Question 2 Marks: 2 How many cubic yards do the F2 footings require? Answer in a decimal format, do not include waste factor either. Answer: Correct Marks for this submission: 2/2. Question 3 Marks: 2 How many cubic yards do the F4 footings require? Answer in a decimal format, do not include waste factor either. Answer: Correct Marks for this submission: 2/2. Question 4
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Marks: 2 Which two footings have the same width? Choose one answer. a. F5 and F7 b. F4 and F10 c. None of the footings share the same width. d. F8 and F9 e. F1 and F3 Correct Marks for this submission: 2/2. Question 5 Marks: 2 What is the cubic yard subtotal of all the footings? Do not include waste, enter your answer in a decimal format, and do not include units. Answer: Correct Marks for this submission: 2/2. Question 6 Marks: 2 Concrete is ordered in 1/10th yard increments. Answer: True False Correct Marks for this submission: 2/2. Question 7 Marks: 2 After a 10% waste factor is applied, what is the ORDER QUANTITY of the concrete just for the footings? Answer: Correct Marks for this submission: 2/2. Question 8 Marks: 2 What is the measured lineal feet for the 4' foundation? Be sure to enter your answer in a decimal format, without the units (i.e. 587.601). Answer: Correct Marks for this submission: 2/2. Question 9 Marks: 2 What is the subtotal amount of concrete for ALL foundations combined? Answer in a decimal, no units, no waste. Answer:
Background image of page 2
Incorrect Correct answer: 107.5 Marks for this submission: 0/2. Question 10 Marks: 2 What is the total amount of Concrete to be ordered for the Sono-tube piers? Choose one answer.
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/15/2011 for the course CM 217 taught by Professor Rogers,m during the Fall '08 term at BYU.

Page1 / 9

CM 217 Concrete - CM 217 Concrete & Masonry Construction...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online