Project  Management
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
5 Basic Functions of  Managing Plan Staff Organize Direct Control A Review…  What do these terms mean to you  relative to your project?    
Background image of page 2
Key Definitions Project management  is the process of  planning and controlling the development of  a system within a specified timeframe at a  minimum cost with the right functionality. project manager  has the primary  responsibility for managing the hundreds of  tasks and roles that need to be carefully  coordinated. Without a project manager, how will you  make sure the tasks and roles in your    
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CREATING THE WORK  PLAN
Background image of page 4
A Workplan Example Work Plan Information Example Name of  task Perform economic feasibility Start date ` Jan 05, 2001 Completion date Jan 19, 2001 Person assigned Mary Smith, sponsor Deliverable(s) Cost-benefit analysis Completion status Open Priority High Resources needed Spreadsheet Estimated time 16 hours Actual time 14.5 hours Note, you would have one of these  for each TASK .   
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Identifying Tasks Top-down approach Identify highest level tasks Break them into increasingly smaller units
Background image of page 6
Top Down Task  Identification Phases Phases with  high level steps Work Plan Deliverables Estimated Actual     Assigned hours hours To * * * *
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Getting the Right Numbers  for Estimation Prior projects Past experience Detailed analysis
Background image of page 8
Increasing Complexity with  Larger Teams
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Timeboxing Fixed deadline Reduced functionality, if necessary Fewer “finishing touches” There will come a point in time when 
Background image of page 10
Image of page 11
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/15/2011 for the course HRM 443 taught by Professor Staff during the Fall '10 term at Wisc Platteville.

Page1 / 35

443_project_management - Project Management AReview...

This preview shows document pages 1 - 11. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online