Lab Preview for T-pipe project

Lab Preview for T-pipe project - today may become an eight...

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
Lab Preview for T-pipe project (and assignment for Thursday) For this project, we will use the parametric capabilities of Pro-Engineer to create a flexible model of a section of flanged pipe as shown. We will also make use of datum planes to make the design robust. The T is to be part of a manifold of an activated carbon filter being built for an R&D (research and development) project for a new home air purification system by the Willowbrook Environmental Quality Co. The project is headed up by Bill Cummings and Jane Ayers.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
The Parameters: Because they are in the design phase of the project, they want to keep the design as flexible as possible for the moment. Jane knows a six inch long pipe requirement
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 6
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: today may become an eight inch pipe tomorrow. For this reason, she is setting up parameters in lieu of fixed dimensions wherever possible. What are some of the parameters that would define the pipe above? The Parameters: What are some of the parameters that would define the pipe above? The Parameters: We are making some assumptions here, such as that the T is perpendicular to the pipe and bisects a pair of bolt holes. The Parameters: For Thursday: Create a three-view drawing of the fitting in AutoCAD using the dimensions shown. Use a separate layer for your dimensions. We will go over the entire process for the drawing on Monday in the recitation....
View Full Document

This note was uploaded on 12/21/2011 for the course MAE 184 taught by Professor Staff during the Fall '08 term at Syracuse.

Page1 / 6

Lab Preview for T-pipe project - today may become an eight...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online