assignp02

assignp02 - Homework 2 15.053 Introduction to Optimization...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
1 Homework 2 15.053 Introduction to Optimization Due at the beginning of class Thursday, February 21, 2002 Error checking hints: For many problems we will provide information about the solution that will help you in determining whether your answer is correct, although it will not provide any guidance in determining the correct answer. The purpose is to permit you to catch any careless errors on your part, and not have them carry through to subsequent questions. For example, if the optimum answer to an LP is 546, we may write that the sum of the digits is 15, or we may write that it is a 3 digit number whose last digit is 6. 1. (Taken from Winston, Operations Research). Leary Chemical manufactures three chemicals: chemical A, chemical B, and chemical C. These chemicals are produced via two production processes: process 1 and process 2. Running process 1 for an hour costs $4 and yields 3 units of chemical A, 1 unit of chemical B, and 1 unit of chemical C. Running process 2 for an hour costs $1 and produces 1 unit of chemical A and 1 unit of chemical B. To meet customer demands, at least 10 units of chemical A, 5 units of chemical B, and 3 units of chemical C must be produced daily.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/20/2011 for the course BUS 15.053 taught by Professor Prof.jamesorlin during the Spring '05 term at MIT.

Page1 / 2

assignp02 - Homework 2 15.053 Introduction to Optimization...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online