Lecture 4: Power Provisioning Prof. Fred Chong 290N Green Computing
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Power Provisioning $10-22 per deployed IT Watt Given 10 year depreciation cycle $1-2.20 per Watt per year Assume $0.07 per kilowatt-hr and PUE 2.0 8766 hours in a year (8766 / 1000) * $0.07 * 2.0 = $1.22724 Up to 2X cost in provisioning eg. 50% full datacenter = 2X provisioning cost
Background image of page 2
Power Distribution Revisited
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Measured Load vs Power
Background image of page 4
Modeled vs. Measured PDU Power
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Methodology
Background image of page 6
Workloads Websearch – high request throughput and large data size Webmail – high I/O Mapreduce – large offline batch jobs
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Websearch Results
Background image of page 8
Webmail Results
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Mapreduce Results
Background image of page 10
Mixed Load
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Real Datacenter
Background image of page 12
Time at Power Level 80 servers 800 servers 8000 servers
Background image of page 13

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Oversubscription Opportunity 7% for racks (80) 22% for PDUs (800) 28% for clusters (8000) Could have hosted almost 40% more machines
Background image of page 14
Power Capping
Background image of page 15

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 16
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 31

Lecture 2 - Lecture 4: Power Provisioning Prof. Fred Chong...

This preview shows document pages 1 - 16. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online